标段: 站前2标编码01010101J0101J010101J01010101J01020101J01030101J01040101J01050101J020101J030101J03010101J040101J04010101J050101J05010101J05020101J060101J06010101Q0101Q010101Q020101Q030101Q03010101Q03020101Q04节号1拆迁及征地费用Ⅰ.建筑工程费一、改移道路1.土石方2.附属圬工3.路面4.防撞墩6.公路涵二、砍伐、挖根三、管道迁改1、给水工程四、跨线公路桥(3座)1.跨线公路桥五、人行天桥(16座)1.新建(15座)2.改建(1座)六、渡槽(2座)1.新建(1座)Ⅳ.其他费1.通讯线路2.电力线路3.接触网线路(1).拆除(2).改建4.油气管道迁改名称工程量清单子目综合单价分析表
清单 第01章 拆迁工程计量单位正线公里正线公里公里立方米圬工方平方米个座元元公里延长米顶面平方米延长米平方米平方米横延米横延米元处处元处个处111551307.744212.52401.191002.99252.23316.24548.96548.962476378290313.9513094.781247.124862.611229.241405.43753.323753.322046.3194.89687.82164.07395.23771.01771.011834215.011039.198.96279.1168.8115.78212.6212.65061593.322420.48230.52650.16160.27269.69495.23495.23835639796.36764.2472.79250.6762.883.83193.67193.67综合单价组成(元)人工费24137.9824137.9894691.931.7831.765.97178.02513.66材料费126245.77126245.77331911.650.5456.7359.43203.657595.67机械使用费25999.1825999.18231025.279.620.556.3473.09305.67填料费措施费6469.536469.5323659.140.754.380.8918.09133间接费14582.9214582.9246837.11.478.961.7635.57309.83税金6614.066614.0624391.940.483.432.4917.03296.67
第1页,共19页
综合单价(元)644956.73207849.44752517.0314.64105.8176.88525.459154.53539322577991302226.3823577.422245.477733.361937.412586.175974.795974.79407121735154895823118230326541338918500
标段: 站前2标编码02020202J0202J010202J01010202J01020202J020202J02010202J02020202J02030202J050202J050102030203J0203J010203J01010203J01020203J01030203J020203J02010203J02020203J050203J050102040204J0204J0143节号2区间路基土石方Ⅰ.建筑工程费一、土方(一)挖土方(二)利用土填方二、石方(一)挖石方(二)利用石填方(三)借石填方五、级配碎石(砂砾石)(一)基床表层站场土石方Ⅰ.建筑工程费一、土方(一)挖土方(二)利用土填方(三)借土填方二、石方(一)挖石方(二)利用石填方五、级配碎石(砂砾石)(一)基床表层路基附属工程Ⅰ.建筑工程费路基附属名称工程量清单子目综合单价分析表
清单 第02章 路基计量单位施工立方米断面立方米立方米立方米立方米立方米立方米立方米立方米立方米立方米施工方断面方立方米立方米立方米立方米立方米立方米立方米立方米立方米正线公里元断面立方米综合单价组成(元)人工费4.543.740.070.060.185.826.090.180.180.960.963.122.70.090.070.180.253.533.50.180.960.96416128993.410.010.011.721.710.0238.2938.2916661425113.740.014.965.230.020.0238.2938.291.561.35材料费5.444.49机械使用费8.416.945.435.323.458.847.643.5512.313.6913.6911.8810.37.156.743.459.5912.5211.953.4513.6913.69157084.51146308511.21填料费措施费0.90.740.350.350.231.020.970.240.80.940.940.990.860.470.440.230.631.061.020.230.940.9480260.3174754450.61间接费1.761.450.70.680.452.021.910.461.571.841.841.941.680.920.860.451.242.082.010.451.841.84167806.32156294811.28税金0.70.580.220.220.140.760.730.150.51.871.870.650.570.290.270.140.390.70.680.141.871.8788466.3882397590.68
第2页,共19页
综合单价(元)21.7517.946.776.634.4623.4222.574.615.3757.5957.5920.1417.468.928.384.4612.1121.6120.874.4757.5957.592730525.2825432112520.93446777.961788858.18
标段: 站前2标编码0204J01010204J0101010204J0101020204J0101030204J0101060204J01020204J0102010204J010201010204J010201020204J010201030204J010201040204J010201050204J010201060204J010201070204J0102020204J010202010204J01020201010204J010202020204J010202030204J010202040204J010202050204J010202060204J010202070204J0102030204J03010304节号一、附属土石方1.土方2.石方3.浆砌石4.混凝土二、加固防护(一)基床加固1.土工布3.干砌石4.混凝土6.中粗砂7.水泥砂浆9.透水软管10.砂卵石(二)地基加固2.垫层(6)填砂夹卵(砾)石3.土工格栅5.干砌石7.碎石桩10.水泥搅拌桩16.强夯18.翻挖碾压(三)坡面防护1.喷混植生名称工程量清单子目综合单价分析表
清单 第02章 路基计量单位断面立方米立方米立方米圬工方圬工方断面立方米元平方米立方米圬工方立方米平方米米立方米元立方米立方米平方米立方米米米平方米立方米元平方米综合单价组成(元)人工费0.264.3118.4831.7670.771.7625946400.6717.7835.647.8437.181.949.1818089099.079.070.417.785.282.152.330.3279811034.740.023424689253.04材料费0.760.663.2556.82350.277.271229801814.8120.79148.5318.65106.7125.813.071284702413.0713.076.7920.7925.822.861.413.686.1718.255.5123085289.2432264531.46.650.549.10.83174938机械使用费0.02填料费措施费0.030.321.44.3810.820.343747300.092.65.711.065.040.261.246774011.231.230.052.62.461.132.520.6614080772.05间接费0.070.642.748.9622.160.737671580.195.3211.682.1810.310.542.5513867952.512.510.115.325.042.35.151.3530575745.64税金0.040.20.873.4315.520.375430170.531.616.9715.340.960.876682090.870.870.241.611.751.160.950.2616415742.5
第3页,共19页
综合单价(元)1.186.1326.74105.89478.6411.31675250116.2949.5215.1830.73164.5829.526.912061479126.7526.757.5949.554.0135.7729.28.125064374877.21
标段: 站前2标编码0204J010203050204J010203060204J010203070204J010203080204J0102040204J010204010204J010204020204J010204030204J010204040204J010204050204J010204060204J0102050204J0102060204J0102070204J0102080204J010208010204J010208020204J0102090204J010209010204J010209020204J010209030204J010209040204J0102100204J0102110204J0103节号2.土工格栅3.锚杆框架梁4.浆砌石13.竹木挡板(四)片石防护1.土方2.石方3.浆砌石4.混凝土5.植草6.栽植灌木(七)路基弃方防护(九)地下排水(十)拆除工程(十一)线路防护栅栏1.拆除防护栅栏1.新建防护栅栏(十二)降噪声工程1.路基声屏障2.桥上声屏障3.隔声窗4.振动措施工程费(十四)路基护轮轨(十五)绿色通道费用二、支挡结构名称工程量清单子目综合单价分析表
清单 第02章 路基计量单位平方米圬工方圬工方米元立方米立方米圬工方圬工方平方米株圬工方米立方米单侧公里单侧公里单侧公里平方米平方米平方米平方米元单轨公里正线公里元4302.464687.4116706923372295.0855729.74687566354336542582.79635.1428351081193.441300.28580412712675.412088.813297718综合单价组成(元)人工费0.4472.633.70.8730338981.089.2427.4235.640.440.2341.944.0716.1723763.613313.1722449.9325.946.4950.2720.06材料费6.791747.6558.81259.47108093390.022.6656.82148.530.478.2566.79100.072.7478447.29509.2978245.36400.36883.571086.46252.7421950.0521.88116.8120.445.721950.054.63206951744.9912.091.946.6584.973.35机械使用费填料费措施费0.0575.225.020.125498282.991.493.985.710.070.046.290.562.666183.81448.936005.816.4521.969.523.49间接费0.11153.9810.280.2411310405.872.928.1511.680.20.112.871.137.3412659.7919.0712295.2913.244.9619.57.15税金0.2484.93.728.745893871.840.953.296.970.040.294.443.540.974790.65173.884721.715.6737.3139.749.68
第4页,共19页
综合单价(元)7.592619.32114.88269.441818300956.7929.35101.6215.181.228.91136.96109.3729.88147795.115364.34145668.145161151.11225.93298.82118439391049.1864441.38101737053
标段: 站前2标编码0204J0103010204J0103070204J0103100204J0103110204J020204J02010204J0201010204J0201020204J02020204J0202010204J020201010204J020201020204J020201030204J020201040204J0202020204J020202010204J0202030204J020203010204J020203020204J020203030204J020203040204J020203050204J0202040204J0202050204J020206节号名称(一)挡土墙片石混凝土(七)桩板挡土墙(十)土钉(十一)抗滑桩站场附属一、附属土石方1.土方3.浆砌石二、加固防护(一)基床加固1.土工布3.干砌石5.渗水土7.中粗砂(二)地基加固3.土工格栅(四)片石防护1.土方3.浆砌石4.混凝土5.液压喷播植草6.栽植灌木(六)改河改沟(七)路基弃方防护(十)拆除工程工程量清单子目综合单价分析表
清单 第02章 路基计量单位圬工方圬工方米圬工方断面立方米断面立方米立方米圬工方断面立方米元平方米立方米立方米立方米元平方米元立方米圬工方圬工方平方米株圬工方圬工方立方米综合单价组成(元)人工费67.5898.7823.2170.920.810.064.1531.760.74114970.6720.878.857.84115210.41023902.5527.4235.640.170.190.7733.728.66材料费254.44508.34113.19352.091.720.090.0656.821.625166014.8126.2410.3518.651967776.792774680.0556.82134.162.917.090.0158.814.6648.523.352653528.31.946.651.11.470.540.17191机械使用费11.8834.4317.4134.610.17填料费措施费10.7117.845.4714.210.130.010.314.380.1215830.093.021.21.0615610.05171362.023.985.70.180.035.735.024.71间接费21.9336.5211.2129.10.270.020.628.960.2632430.196.22.452.1831960.11366553.978.1511.680.50.0911.7410.2813税金12.2823.315.7116.780.10.010.173.430.122840.531.940.77171370.24154171.233.296.50.160.252.243.721.71
第5页,共19页
综合单价(元)378.82719.22176.2517.713.20.195.31105.893.017045816.2959.7423.6230.732201927.5947560138.12101.6200.335.027.6569.01114.8852.74
标段: 站前2标编码03050305010305010103050101J03050101J0103050101J010103050101J010203050101J01020103050101J01020203050101J010303050101J0203050101J020103050101J020203050101J0303050101J030103050101J0403050101J040103050101J0503050101J0603050101J0703050101J070103050101J070203050101J070303050101J08节号5特大桥(10座)一、复杂特大桥(3座)(一)薛家坝涪江特大桥Ⅰ.建筑工程费1.基础(1)明挖(2)承台①混凝土②钢筋(5)钻孔桩2.墩台(1)混凝土(2)钢筋3.预应力混凝土简支箱梁(4)造桥机(64m)6.预应力混凝土连续梁(刚构)(1)68+128+68连续刚构15.桥面系16.附属工程17.基础施工辅助设施(1).围堰(2).钢板桩围堰(3).辅助设施19.造桥机运输及拼装场地名称工程量清单子目综合单价分析表
清单 第03章 桥涵计量单位延长米延长米延长米延长米圬工方圬工方圬工方圬工方吨米\\圬工方圬工方圬工方吨孔孔延长米圬工方延长米延长米元立方米吨延长米元综合单价组成(元)人工费2360.334510.977655.987655.988651.7356.554.52144.29材料费13803.6631649.9552384.352384.3378.19183.52277.18229.993450.01机械使用费4387.769963.8617559.5917559.59532.3233.8249.8248.9365.52填料费措施费614.991337.232342.552342.5549.36.848.428.1917.1间接费1350.842919.685102.425102.42108.5115.0218.5318.0137.63税金754.341687.792849284938.679.7513.7512.05124.44
第6页,共19页
综合单价(元)23271.9252069.4887893.8487893.841192.99300.68424.2371.693838.99209.55\\120863.51\\4971909.62\\11.78.7200.6867.4454.1288.63142407.4142407.48447.41539.12242.28311.2311845141.891155.03473.19198188392.55227.993562.47838649.3838649.395246.926078.711502.781250.5362414112.27846.111695.362447044061.921497.4212283078.1661.79354.42220552.6220552.66238.73398.1659.62272.863851084169.1\\97.4372.13\\214118.05\\68.3641.96\\20997.4904.1811.689.2951.645390.745390.71763.81112.5756.2246.883915750.16410.19150.622498425.6920.45113.5696804.996804.93761.69240.07130.99103.178617510.34902.71331.475498419.2812.52146.4245017.545017.53867.86246.8566.7366.494197660.15481.59138.9621631594.8386.144517.11388822.41388822.4119326.427615.482058.622051.16129501014.7414857.554287.02667321
标段: 站前2标编码0305010203050102J03050102J0103050102J010103050102J010203050102J01020103050102J01020203050102J010303050102J0203050102J020103050102J020203050102J0403050102J040103050102J0503050102J0603050102J0703050102J070103050102J070203050102J07030305010303050103J03050103J0103050103J010103050103J0102节号名称(二)穿井坝涪江特大桥Ⅰ.建筑工程费1.基础(1)明挖(2)承台①混凝土②钢筋(5)钻孔桩2.墩台(1)混凝土(2)钢筋6.预应力混凝土连续梁(刚构)(1)68+128+68连续刚构15.桥面系16.附属工程17.基础施工辅助设施(1).围堰(2).钢板桩围堰(3).辅助设施工程量清单子目综合单价分析表
清单 第03章 桥涵计量单位延长米延长米圬工方圬工方圬工方圬工方吨米\\圬工方圬工方圬工方吨延长米圬工方延长米延长米元立方米吨延长米延长米延长米圬工方圬工方圬工方综合单价组成(元)人工费4994.324994.32109.9262.1890.5285.95144.29材料费38121.6138121.61386.54185.94311.82202.423450.02机械使用费11642.0611642.06620.6440.674.0372.5746.06填料费措施费1498.171498.1758.018.1513.0212.5215.65间接费3273.483273.48127.6617.9328.6527.5634.43税金1994.251994.2543.6410.5517.3613.43123.63
第7页,共19页
综合单价(元)61523.8961523.891346.41325.35535.4414.453814.08203.3\\140.733.08\\5072000.22\\1363.1183.655649.06192.038447.41539.12240.2177.39103732718.654902.56471.3689.39689.3996.1866.9575.6351.31217.963692.9195246.926078.711487.6119.58568836622.0236763.441688.563025.743025.74272.63183.87257.6319360.861491.4200.79200.7985.2535.6947.1369.5757.31339.656238.73398.1658.53373596363175.05\\121385.25\\266117.15\\81.3614.05\\2500.09.4904.019.938.4241.791763.81112.5755.628.993600931.531908.56150.01108.92108.9214.428.239.7821.8518.5391.983761.69240.07129.619.787924663.384200.23330.13248.21248.2131.7318.121.5217.0411.77146.013867.86246.8566.058.83844001.532249.04138.4143.15143.1516.7610.4913.79525.7363.054504.37119326.427615.482037.61271.541185901547.1169384.694269.84416.24416.2516.97323.33425.45(三)明月坝三线特大桥(部分新建)Ⅰ.建筑工程费1.基础(1)明挖(2)承台
标段: 站前2标编码03050103J01020103050103J01020203050103J010303050103J0203050103J020103050103J020203050103J0303050103J04030502030502J030502J01030502J0101030502J010101030502J010102030502J01010201030502J01010202030502J010104030502J010105030502J0102030502J010201030502J010202030502J0103030502J0104030502J0105节号①混凝土②钢筋(4)挖孔桩2.墩台(1)混凝土(2)钢筋3.桥面系4.附属工程二、一般特大桥(7座)Ⅰ.建筑工程费A、单线特大桥(6座)(一)基础1.明挖2.承台(1)混凝土(2)钢筋4.挖孔桩5.钻孔桩(二)墩台1.混凝土2.钢筋(十三)桥面系(十四).附属工程(十五).基础施工辅助设施名称工程量清单子目综合单价分析表
清单 第03章 桥涵计量单位圬工方吨圬工方圬工方圬工方吨延长米延长米延长米延长米延长米圬工方圬工方圬工方圬工方吨圬工方米\\圬工方圬工方圬工方吨延长米延长米元综合单价组成(元)人工费72.76144.31117.3456.3255.14200.76299.36235.821405.181405.181592.6648.8156.9398.1295.27144.29119.58材料费189.913450.05293.05230.68210.23472.971608.78915.185877.75877.76659.78148.02184.87292.97224.793450305.97机械使用费46.2346.08124.141.0640.34122.1255.516.681911.281911.282166.55111.1352.1557.8755.9796.22132.18填料费措施费9.4715.6719.167.747.5926.4665.7420.7294.23294.23333.5212.788.5812.4712.0919.3919.87间接费20.8534.4842.1617.0316.6958.22153.1945.56654.09654.09741.4228.1318.8727.4526.6142.6743.73税金11.36123.6219.9611.8211.05130.0673.1241.34339.78339.78385.0511.6910.7716.3813.89125.7120.81
第8页,共19页
综合单价(元)350.583814.21615.77364.65341.014010.592255.691275.2810482.2610482.2611878.98360.56332.17505.26428.623878.28642.14208.95\\158728.77\\5511812.09\\13.01.0970.2968.2758.18344.45247.3533.41152333334.09231.63498.631524.8544.6123813661.6948.86437.9261.1219.8820338162.16\\122356.88\\269109.51\\82.3378.36\\2554.62.8781.6910.438.5962.5957.454.151405522.9518.92137.73133.879.123093216.6612.27150.1367.833.7215269514.09378.424631.452092.47114.89471063
标段: 站前2标编码030502J02030502J0201030502J020101030502J02010203060306010306010103060101J03060101J0103060101J010103060101J010203060101J01020103060101J01020203060101J010303060101J010403060101J0203060101J020103060101J020203060101J030306X02J1403060101J050306010303060103J03060103J016节号名称(四)既有线预留架梁(1座)(二)墩台1.混凝土2.钢筋6.大桥(50座)二、一般梁式大桥(50座)A、单线大桥(43座)Ⅰ.建筑工程费(一)基础1.明挖2.承台(1)混凝土(2)钢筋4.挖孔桩5.钻孔桩(二)墩台1.混凝土2.钢筋(十三)桥面系(十四)附属工程(十五)基础施工辅助设施B、既有线预留架梁(7座)Ⅰ.建筑工程费(一)基础工程量清单子目综合单价分析表
清单 第03章 桥涵计量单位延长米圬工方圬工方吨延长米延长米延长米延长米圬工方圬工方圬工方圬工方吨圬工方米\\圬工方圬工方圬工方吨延长米延长米元延长米延长米圬工方综合单价组成(元)人工费2.2779.449.27153.291356.271356.271381.74843.61108.6284.0894.0890.82144.29126.99材料费25.52891.51208.793473.475198.915198.915316.153245.73327.3197.39276.29198.333450.01386.34机械使用费1.1239.0918.79103.291479.841479.841591.35971.58190.1353.4163.0759.86141.86125.11填料费措施费0.279.615.4721.05257.82257.82270.27165.0223.9310.912.4911.9722.7919.95间接费0.621.1212.0346.27574.4574.4602.19367.6652.662427.4826.3450.1643.9税金134.879.87127.19297.05297.05306.92187.3923.5412.3915.8612.98127.6123.52
第9页,共19页
综合单价(元)30.781075.6304.223924.569164.299164.299468.625780.99726.18382.17489.27400.33936.72725.81206.77\\157771.4\\588.1500.45\\11.620343.7862.0256.16289.49246.1478.5123142960.26960.2695.01269.79213.43477.891524.53131.21484344206.614206.61237.746.7242.94172.8460.2738.4619327658.27658.2768.8138.38\\105304.54\\23297.87\\74.63019.41\\2301.49.151.688.677.8937.9657.059.243348149.01149.0112.9719.0817.3683.54132.9520.347367332.3332.328.5313.6111.31136.0767.79.33404211.27211.2714.84419.89349.064197.792088.64287.061050226517.726517.72457.85
标段: 站前2标编码03060103J010103060103J010203060103J01020103060103J01020203060103J010303060103J0203060103J020103060103J020203060103J0303060103J040306010403070307J0307J010307J01010307J0101010307J010101010307J010101020307J01010102010307J01010102020307J010101030307J010101040307J0101020307J010102017节号1.明挖2.承台(1)混凝土(2)钢筋4.挖孔桩(二)墩台1.混凝土2.钢筋(十三)桥面系(十四)附属工程C、综合接地中桥(8座)Ⅰ.建筑工程费一、梁式中桥(8座)A、单线中桥(8座)(一)基础1.明挖2.承台(1)混凝土(2)钢筋4.挖孔桩5.钻孔桩(二)墩台1.混凝土名称工程量清单子目综合单价分析表
清单 第03章 桥涵计量单位圬工方圬工方圬工方吨圬工方圬工方圬工方吨延长米延长米个延长米延长米延长米延长米圬工方圬工方圬工方圬工方吨圬工方米\\圬工方圬工方圬工方综合单价组成(元)人工费73.75156.46153.53144.27100.7760.8853.81323.64146.44188.0545.7912330.1212330.1212330.1212330.12134.43150.57108.29103.23144.29115.31材料费185.87377.78307.763450261.78289.18213.23480.29907.83679.0530.7172533.2172533.2172533.2172533.21286.42233.63329.21208.233450300.11机械使用费58.7556.6355.746.02113.9244.4140.18194.1934.67167.922.722968.932968.932968.932968.93259.2199.44445.8444.1946.05119.24填料费措施费10.4417.1216.815.6316.888.417.4842.5533.729.133.992730.712730.712730.712730.7164.1940.9788.2687.1332.3538.35间接费22.9837.6736.9834.4737.1618.5116.4693.6278.5364.118.786362.556362.556362.556362.55149.5295.44205.6202.9675.3789.32税金11.7921.6319.12123.5917.7714.1211.09138.540.2437.83.08324732473247324729.9420.7739.4435.03125.5622.19
第10页,共19页
综合单价(元)363.58667.29589.893813.98548.28435.51342.224272.791241.411166.0695.07100172.52100172.52100172.52100172.52923.71640.821216.61080.773873.62684.52219.72\\179646.45\\5261608.26\\13.05.7910.5664.1258.45272.15212.6343.7440.77308.44\\251718.47\\585117.29\\95.3618.63\\2948.34.4858.817.7816.3141.423814.7112.27453.92378.43
标段: 站前2标编码0307J010102020307J0101030307J0101040307J01010503080308J0308J01010308G0103090309J0309JX0309JX010309JX01010309JX0101010309JX0101020309JX0101030309JX010103010309JX010103020309JX01020309JX0102010309JX0102020309JX0102030309JX010203010309JX020309JG98节号2.钢筋(十三)桥面系(十四)附属工程(十五)基础施工辅助设施小桥(1座)Ⅰ.建筑工程费三、框架式桥(1座)(一)现浇涵洞(126座)Ⅰ.建筑工程费甲、新建三、盖板箱涵(67座)(一)单孔(65座)1.涵身及附属2.明挖基础(含承台)3.地基处理①换填⑤旋喷桩(二)双孔(2座)1.涵身及附属2.明挖基础(含承台)3.地基处理①换填七、倒吸虹管(1座)乙、改建(58座)名称工程量清单子目综合单价分析表
清单 第03章 桥涵计量单位吨延长米延长米元延长米延长米顶面平方米顶面平方米横延米横延米横延米横延米横延米横延米圬工方元立方米米横延米横延米圬工方元立方米横延米横延米综合单价组成(元)人工费330.4910911.310.471727312117.2912117.291187.971187.973305.133305.133765.83800.873725.642538.2162.951121569.163.625792.114663.3830.9378009.18628.432446.13材料费3472.4668830.3524.262114456660.3756660.375554.945554.949753.779753.7711587.9811696.6611449.947707.49192.6349309014.923.718226.7311934.62192.061110913.071865.696333.63205.311637.6917.291810.92920.1928.1420420.5320420.532002.012002.011712.291712.291752.31769.591768.03845.640.05301596机械使用费173.52713.660.21填料费措施费85.642130.351.8229365208.195208.19510.61510.61829.64829.64913.89922.57909.48563.216.81703381.563.561269.12938.699.6413261.56137.44672.55间接费199.54964.054.23684012131.9712131.971189.411189.411932.581932.582128.842149.052118.551311.9239.141638453.628.282956.332186.622.4430893.63320.191566.64税金142.762932.921.3716143569.043569.04349.9349.9587.37587.37674.98681.35669.05434.3711.78382240.981.891006.85691.569.497810.92105.75424
第11页,共19页
综合单价(元)4404.3790482.6342.3649807110107.39110107.3910794.8410794.8418120.7818120.7820823.7921020.0920640.6913400.79363.36117924930.2258.3431062.0621335.04292.72410528.363262.8113080.64
标段: 站前2标编码0309JG010309JG01010309JG0101010309JG0101020309JG0101030309JG010103010309JG010103020309JG02节号名称(三)盖板箱涵(56座)1.单孔(56座)(1)涵身及附属(2)明挖基础(含承台)(3)地基处理①换填⑤旋喷桩七、倒吸虹管(2座)工程量清单子目综合单价分析表
清单 第03章 桥涵计量单位横延米横延米圬工方元立方米米横延米综合单价组成(元)人工费2474.51740.0939.97492594.581.971251.06材料费6432.234559.7895.992007087.09132180.229.39342.05机械使用费1668.441132.822.73117475填料费措施费682.22473.410.24283450.781.93265.22间接费1589.171102.7623.84660271.814.5617.78税金430.36301.86.46154710.481.04156
第12页,共19页
综合单价(元)13276.929310.63199.2347728514.7431.834812.33
标段: 站前2标编码04100410X0410X010410X01010410X0101J0410X0101J010410X0101J01010410X0101J01020410X0101J01030410X0101J01040410X0101J020410X0101J030410X0101J040410X0101J050410X020410X02010410X0201J0410X0201J010410X0201J01010410X0201J01020410X0201J01030410X0201J01040410X0201J020410X0201J030410X0201J04节号10隧道(35座)甲、新建一、L>4km的隧道(1座)(一)新荆竹岭隧道Ⅰ.建筑工程费1.正洞(2)Ⅱ级围岩(3)Ⅲ级围岩(4)Ⅳ级围岩(5)Ⅴ级围岩2.明洞及棚洞4.洞门6.弃碴工程9.泄水洞二、3km<L≤4km的隧道(1座)(三)新西山坪隧道Ⅰ.建筑工程费1.正洞(2)Ⅱ级围岩(3)Ⅲ级围岩(4)Ⅳ级围岩(5)Ⅴ级围岩4.洞门6.弃碴工程11.采空区处理工程名称工程量清单子目综合单价分析表
清单 第04章 隧道及明洞计量单位延长米延长米延长米延长米延长米延长米延长米延长米延长米延长米延长米延长米延长米延长米延长米延长米延长米延长米延长米延长米延长米延长米延长米延长米元综合单价组成(元)人工费5702.885702.885431.735431.735431.735039.052411.613508.893902.78491.23551.1918.81142.66390.865040.585040.585040.584810.912963.134049.134899.836688.4211.38163.5180377材料费16010.1716010.1714808.5914808.5914808.5913790.74787810535.5910807.622203.9612849.3148.7301.091096.8116240.2316240.2316240.2315356.988452.6612349.614913.7323761.8938.42353.671617389机械使用费4748.044748.044627.884627.884627.884074.482723.374031.773549.655174.733081.9214.55290.18414.494432.624432.624432.624235.243628.534307.654074.545190.918.17168.4668335填料费措施费1071.221071.221042.181042.181042.18948.3533.26783.59776.881420.21659.963.3341.2583.07983.74983.74983.74941.36682.99867.83934.781237.441.9532.5625939间接费2304.262304.262241.772241.772241.772039.841147.081685.531671.13054.961419.627.1588.73178.692116.092116.092116.092024.911469.151866.762010.762661.84.270.0355797税金999.53999.53943.1943.1943.1867.39492.22688.27693.721351.56722.353.128.9472.49965.24965.24965.24916.87576.08785.27898.921324.612.1526.4165253
第13页,共19页
综合单价(元)30836.130836.129095.2529095.2529095.2526759.815185.5421233.6421401.6541696.6222284.3595.64892.852236.4129778.529778.529778.528286.2717772.5424226.2427732.5640865.0766.27814.632013090
标段: 站前2标编码0410X030410X03010410X0301J0410X0301J010410X0301J01010410X0301J01020410X0301J01030410X0301J020410X0301J030410X0301J040410X03020410X0302J0410X0302J010410X0302J01010410X0302J01020410X0302J01030410X0302J01040410X0302J020410X0302J02010410X0302J030410X0302J040410X0302J050410X0302J060410X040410X0401节号名称四、1km<L≤2km的隧道(5座)(一)单线隧道(4座)Ⅰ.建筑工程费1.正洞(3)Ⅲ级围岩(4)Ⅳ级围岩(5)Ⅴ级围岩2.明洞及棚洞4.洞门6.弃碴工程(四)新松林堡隧道Ⅰ.建筑工程费1.正洞(2)Ⅱ级围岩(3)Ⅲ级围岩(4)Ⅳ级围岩(5)Ⅴ级围岩3.辅助坑道(5)横向连接通道4.洞门6.弃碴工程7.预加固工程9.煤层采空区五、L≤1km的隧道(28座)(一)单线隧道(26座)工程量清单子目综合单价分析表
清单 第04章 隧道及明洞计量单位延长米延长米延长米延长米延长米延长米延长米延长米延长米延长米延长米延长米延长米延长米延长米延长米延长米延长米延长米延长米延长米延长米元延长米延长米综合单价组成(元)人工费5744.935681.075681.075358.013389.694008.638494.513189.4293.82284.456007.286007.285523.833306.94892.685344.716590.06429.6429.688.76174.75197.61788636017.055627.95材料费16437.6115679.1115679.1114570.1110157.4710755.9922497.512823.15389.72772.8519553.9819553.9817123.728181.0211204.0811714.1525122.911128.471128.47258.75359.87654.5203571616176.3715390.23机械使用费4480.074458.564458.564002.243314.453055.555637.782745.9141.36350.044568.454568.454232.133521.24106.013873.314712.11410.61410.6166.06172.9278.26625855089.744861.29填料费措施费1058.921049.581049.58973.41695.77736.161469.09594.6724.1461.881097.311097.311014.63707.12933.68958.871177.1186.7286.7215.4534.1428.86252301121.861057.61间接费2277.82257.712257.712093.861496.651583.513160.11279.1751.92133.112360.362360.362182.521521.062008.392062.572532.01186.56186.5633.2473.4362.07542712413.192274.98税金1004.98975.72975.72904.42638.31674.681382.18691.1823.4853.681125.181125.181007.57577.45775.35802.451344.4975.175.115.4927.3134.21789481032.41978.6
第14页,共19页
综合单价(元)31004.3130101.7530101.7527902.0519692.3420814.5242641.1621323.49724.441656.0134712.5634712.5631084.417814.7523920.1924756.0641478.692317.062317.06477.75842.421055.5243561331850.6230190.66
标段: 站前2标编码0410X0401J0410X0401J010410X0401J01010410X0401J01020410X0401J01030410X0401J020410X0401J030410X0401J040410X04020410X0402J0410X0402J010410X0402J01010410X0402J01020410X0402J020410X0402J030410X0402J040410X0402J050410X04030410X0403J0410X0403J010410X0403J01010410X0403J020410X0403J030410X0403J04节号Ⅰ.建筑工程费1.正洞(3)Ⅲ级围岩(4)Ⅳ级围岩(5)Ⅴ级围岩2.明洞及棚洞4.洞门6.弃碴工程(四)新龙家湾隧道Ⅰ.建筑工程费1.正洞(4)Ⅳ级围岩(5)Ⅴ级围岩4.洞门5.管棚支护6.弃碴工程7.预加固工程(五)新谢家湾隧道Ⅰ.建筑工程费1.正洞(5)Ⅴ级围岩2.明洞及棚洞4.洞门6.弃碴工程名称工程量清单子目综合单价分析表
清单 第04章 隧道及明洞计量单位延长米延长米延长米延长米延长米延长米延长米延长米延长米延长米延长米延长米延长米延长米延长米延长米延长米延长米延长米延长米延长米延长米延长米延长米综合单价组成(元)人工费5627.955140.313109.324973.96675.635648.34331.1240.2213240.6713240.6712807.4511154.1113368.96202.7628.6714.73187.0614022.6714022.6714054.3514054.353998.57306.66190.92材料费15390.2313868.259941.449763.3224633.2317125.51067.44622.6429156.2529156.2527748.9914833.8232135.27499.98343.5827.84535.8836661.2136661.2136820.8336820.8313228787.81294.29机械使用费4861.293914.233783.263207.315528.83716.38355.64673.019248.79248.78762.27909.749051.71191.5992.27161.2841.3510009.6510009.6510049.610049.62248.14215.81154.84填料费措施费1057.61919.51693.22830.351243.82942.2269.0486.122305.732305.732214.261954.362302.5338.9312.6316.0223.892467.82467.82478.382478.38636.2952.2634.11间接费2274.981977.91491.161786.132675.512026.77148.51185.244959.744959.744762.994203.924952.8783.7327.1734.4551.395308.375308.375331.145331.141368.57112.4273.37税金978.6864.98637.12688.791365.36986.8866.0560.541973.521973.521885.911341.882070.6834.0716.98.5228.132293.742293.742302.62302.6719.5749.4225.05
第15页,共19页
综合单价(元)30190.6626685.1819655.5221249.842122.3530446.092037.781867.7760884.6160884.6158181.841397.8363882.021051.06521.22262.84867.770763.4470763.4471036.971036.922199.141524.38772.58
标段: 站前2标编码0719071901071901J071901J01节号19电力牵引供电一、接触网Ⅰ.建筑工程费(八)接触网杯型基础名称工程量清单子目综合单价分析表
清单 第07章 电力及电力牵引供电计量单位正线公里条公里条公里个综合单价组成(元)人工费17106.1612116.112116.11259.5材料费29830.5321128.6421128.642196.38机械使用费133.3794.4694.469.82填料费措施费3465.152454.332454.33255.13间接费9105.926449.626449.62670.45税金1997.981415.151415.15147.11
第16页,共19页
综合单价(元)61639.1143658.343658.34538.39
标段: 站前2标编码09250925J0925J010925J01010925J0102节号25站场Ⅰ.建筑工程费一、站场建筑(一)站台墙(九)站名牌名称工程量清单子目综合单价分析表
清单 第09章 其他运营生产设备及建筑物计量单位正线公里正线公里元米个综合单价组成(元)人工费173.54173.5416164112.81185.5材料费661.76661.7661636435.84309机械使用费11.7411.7410947.78填料费措施费31.4631.46293020.4633间接费73.2773.27682447.6576.5税金31.8931.89297020.9220.5
第17页,共19页
综合单价(元)983.66983.6691618645.38632.5
标段: 站前2标编码10281028J1028J011028J01011028J0101011028J0101021028J0101031028J01021028J0111节号名称工程量清单子目综合单价分析表
清单 第10章 大型临时设施和过渡工程计量单位正线公里正线公里元公里公里公里公里处处综合单价组成(元)人工费材料费机械使用费填料费措施费间接费税金
第18页,共19页
综合单价(元)130970.8130970.812198620108319.571805001140009500023800038000028大型临时设施和过渡工程Ⅰ.建筑工程费一、大型临时设施(三)汽车运输便道2.新建引入线3.改(扩)建便道4.整修既有道路(十一)级配碎石拌和站(十四)混凝土集中拌和站
标段: 站前2标编码11291129Q1129Q011129Q02节号29其他费Ⅳ.其他费一、营业线施工配合费九、安全生产费名称工程量清单子目综合单价分析表
清单 第11章 其他费计量单位正线公里元元元综合单价组成(元)人工费材料费机械使用费填料费措施费间接费税金
第19页,共19页
综合单价(元)266171.992479125945968524331574